|
Inventory of the status of the operational management system to be assessed as well
as the operations
Below mentioned questionnaire will be used to estimate how far your management system
is operational and is being used. Moreover what the present situation is on process
installation, buildings and premises.
|
|
7.1 Is your company already certified? If yes, which schemes (i.e. ISO9001, HACCP
etc):
If yes, by which Certification Body?
|
 |
|
|
7.2 Has your company any other certificates? Which:
|
|
|
7.3 Has your company introduced a quality management system in which the following
aspects have been documented and are operational:
|
|
|
7.3.1 specifications of: raw materials, ingredients, packing, final products.
|
 |
|
|
7.3.2 production/process instructions/procedures regarding quality & food safety.
|
|
|
7.3.3 determination of HACCP-hazards and risk analysis in general control measures
and CCP’s per production phase/product.
|
|
|
7.3.4 effective use of determined control measures and CCP-activities and results
registration
|
|
|
7.3.5 traceability completely introduced and demonstrable with raw materials, ingredients,
in process and with final products
|
|
|
7.3.6 recall procedure is demonstrable present and tested
|
|
|
7.3.7 internal audit of the quality system
|
|
|
7.3.8 management review by managing director regarding the system effectiveness
|
|
|
7.3.9 determination/adjusting of company policy by directors regarding quality &
food safety |
|
|
7.3.10 training program for personnel regarding hygiene & food safety |
|
|
7.3.11 suppliers assessment/approval/surveillance |
|
|
|
|
|
7.4 Did you have any assistance of a consultant with the development of your quality
system, If yes, please provide the details of the consultant engaged.
|
 |
|
|
7.4.1 Did you or your consultant assess your company’s quality system?
|
|
|
7.4.2 Are you familiar with the certification standard you have applied for?
|
|
|
7.4.3 Have you made up a cross reference list between the Standard and your quality
management system?
|
|
|
|
|
|
7.5 Information about the premises:
|
 |
|
|
7.5.1 more then 1 main building / widely spread buildings?
|
|
|
7.5.2 older buildings / not specific designed for the present production activities?
|
|
|
7.5.3 complex internal logistics (like many different buildings etc)?
|
|
|
7.5.4 risks for cross contamination (low, medium, high)?
|
|
|
7.5.5 product handling mainly by workers?
|
|
|
7.5.6 product handling mainly automated?
|
|
|
|
 |
|
7.6 Area of premises (in sq. meters)
|
 |
|
|
7.6.1 raw materials (including receiving & storage)
|
|
|
7.6.2 processing (from incoming goods till final products)
|
|
|
7.6.3 final product handling (storage and loading/shipping)
|
|